Typical Resources Deployment

All phases do not work under uniform manpower-loading; naturally, Phase 1 starts with light manpower during the conceptual study and reaches peak manpower (100%) at Phase 3; it decreases again when flight testing starts, by which stage the design work is virtually done and support work continues. Figure 2.2a is a typical distribution of cost and manpower loading (an average percentage is shown); the manpower-loading forecast must be finalized during the Phase 1 study. Figure 2.2b shows the cumulative deployment. At the end of a project, it is expected that the actual figure should be close to the projected figure. Project costs consist primarily of salaries (most of the cost), bought-out items, and relatively smaller miscellaneous amounts (e. g., advertising, travel, and logistics). Chain lines in Figure 2.2 illustrate the cost-frame outlay.

Table 2.1. Development costs up to certification included

Aircraft class (turbofan)

Development cost (US$*) Unit cost (US$*)

6-passenger general aviation aircraft

6 to 10 million

^1 to 2 million

10-passenger business aircraft

20 to 40 million

5 to 8 million

50-passenger regional aircraft

50 to 100 million

20 to 30 million

150-passenger midsized aircraft

200 to 500 million

40 to 50 million

500+ – passenger large aircraft

2 to 10 billion?

140 to 200 million

Military combat aircraft (high end)

5 to 15 billion?

100+ million?

*Does not include production launch cost. Typical cost at 2000 level.